Here are the latest pictures, showing the work to the ceiling of the senior Maths classroom.




The front of the school has become a dumping ground once again, hence the need for replacing the grass with stones!




After an intricate lattice-work of reinforced steel was set in place, it was time for a hose to be connected from a cement mixer lorry parked outside the school then into the classroom. Then the cement was pumped through and spread evenly across the floor throughout the room. It was quite fascinating to watch!



Here is a short video showing how the cement was applied:








