Monday, 28 June 2010
Renovations
We have started with the work to replace the floors/ceilings in the main school building. The above picture shows one of the classrooms on the second floor after the tiles and 20cm of sand have been removed, exposing the wood. To think that this is probably the first time this wood has seen the light of day since 1875!
Our primary hall has become a temporary storage room for bags of sand!
This was once our English room. This floor is also going to be replaced.
The exposed wood, ready for removing and will be replaced with a concrete floor.
Subscribe to:
Post Comments (Atom)
And what are you doing at school at that time?!
ReplyDelete