Thursday 8 July 2010

The first floor is poured...

After an intricate lattice-work of reinforced steel was set in place, it was time for a hose to be connected from a cement mixer lorry parked outside the school then into the classroom. Then the cement was pumped through and spread evenly across the floor throughout the room. It was quite fascinating to watch!
Here is a short video showing how the cement was applied:



The finished product so far...and no, there is nothing sinister buried in the cement; just a few scattered shekels!